Capture

MWH to Build Second Water Treatment Plant for Town of Eagle

The Town of Eagle has awarded MWH a $23 million contract as construction manager at risk for the Lower Basin Water Treatment Plant. Eagle’s current plant runs at about 80 percent capacity during the peak summer lawn irrigation season.

Check out the full story from Vail Daily below:

6.21.18 Article

icon-facebook icon-instagram icon-linkedin icon-phone icon-search icon-twitter icon-youtube