Avon Lake Regional Water Pollution Control Center
This was a $33 million hard bid project consisting of a new headworks facility, a new grit removal system, replacement of the primary sludge collection system with new chain and flights; a new alum sludge pump building and gravity thickener. The overall project also included a new UV system, SCADA system, electrical, HVAC, plumbing, and fire protection systems.
- After developing the pre-bid schedule, MWH concluded that the project duration could be shortened. The project was completed ten months ahead of schedule.
- Additionally, the MWH team was contracted as the CMAR to procure and construct a 3.0 million gallon elevated composite tank.
Project Impact


- Provides more reliable water and wastewater service while reducing overflows into Lake Erie.