Utilizes BIM design models and immersive technology (VR/AR) to review design/as-built in pre-construction.
A process in which the BIM design models are used to generate accurate quantity take-offs and cost estimates throughout.
Integrates BIM design models and as-built scans from Design/Engineer and subs – analyze for clashes – and resolve prior to delivery.
Deploys surveying tools (laser scan, drones, etc.) to capture site and as-built data for project scoping, excavation and planning.
Continuous linking of models (and construction resources) to schedule using 4D for plan vs. actual visual planning and progress reporting.
4D simulation is used where construction activities need to be well-planned and practiced prior to field execution.
Uses cloud-based mobile tools to track/manage progress and capture/submit field issues in real time.
In addition to the traditional value of BIM technology, Maine Water appreciates how MWH was able to provide complex illustrations and material lists to isolate and identify project elements directly involved in the water treatment process, which are exempt from sales tax in Maine, from all other project elements. We were successful in reducing the sales tax expense on our project by hundreds of thousands of dollars, thanks in large part to the MWH team and BIM technology.
valued at over $4 billion currently deploying Digital Delivery
in Virtual Design & Construction tools and practices located in offices and projects across the USA
targeted for improvement using Digital Delivery on every project – Schedule Delays, Safety Risks, Rework, Onsite Construction Labor, and Commissioning Time